Order before 12 noon - for next working day delivery
Greater London - order by 10am (conditions apply)
Overview
This revolutionary new material is installed and performs in exactly the same way as traditional mineral fibre insulation but, thanks to the absence of floating fibres, unpleasant working conditions have been relegated to a thing of the past.
In contrast with mineral fibre, which requires a large amount of energy in its production, the manufacture of Non-Itch creates a very low carbon footprint as the expended energy is very low. For every 1 ton of plastic bottles used in the manufacture of Non-Itch Loft Insulation, 1.5 tons of carbon emissions are prevented from polluting the atmosphere; this is even before the product is installed, at which point it continues to reduce your carbon footprint and benefit the environment.
YBS Non-Itch is fully tested and certified insulation (UKAS Cert. 1145 - 738 : Agrément No's. BPD 07-217/8, Patent Pending) offers specifiers, housebuilders, contractors the opportunity to install insulation into lofts, partitions and timber frame buildings without any of the drawbacks normally experienced with glass or mineral wools.
Non-Itch Insulation is supplied in easy to handle rolls designed to be installed in exactly the same way as mineral fibre or fibre glass and provides the same thermal conductivity
Non-Itch Timber Frame Insulation Slab
Non-Itch Timber Frame Insulation Slabs are for the
thermal insulation of external walls in timber frame
construction. Non-Itch Timber Frame Insulation
Slabs are fitted between studs.
Non-Itch Cavity Insulation Slab 39
Non-Itch Cavity Insulation slab 39 are for the thermal insulation of external masonry walls. Non-Itch Cavity Insulation slab 39 are fitted within the cavity.
Features
Totally safe and easy to install with no protective clothing required.
Ensures a safe indoor air quality.
Fully recyclable and uses recycled material in its production.
Provides good acoustic properties to help keep your home or commercial environment quiet and free from noise pollution.
Non-Itch is unaffected by water.
Ideal for eco builds.
Long term stability and durability 50 years +
Every one tonne of plastic bottles recycled for the manufacture of Non-Itch saves one and a half tonnes of carbon emissions into our atmosphere and so has a dramatic positive impact in our efforts to save our planet.
Non-Itch will not deteriorate over time and will not be affected by mould, mildew or rot.
Non-Itch is also resistant to vermin and insect attack.
Non-itch is certified by UKSD and is DBA Agrément certified.
Applications
Non-Itch Timber Frame Insulation Slabs are for the thermal insulation of external walls in timber frame construction. Non-Itch Timber Frame Insulation Slabs are fitted between studs.
Handling and Storage
Non-Itch Timber Frame Insulation Slab is easy to handle with no protective clothing and easy to install, being lightweight and easily cut to size. It is supplied in polythene packaging, designed for short term protection only.
YBS Non-Itch Insulation Slabs - Product Properties
Thickness |
Width |
Length |
Area |
Slabs
Per Pack |
Thermal
Conductivity |
Thermal Resistance |
25mm |
600mm |
1.2m |
18m² |
25 |
0.0425 W/mk |
0.588 M²K/W |
40mm |
600mm |
1.2m |
10.8m² |
15 |
0.0425 W/mk |
0.941 M²K/W |
50mm |
600mm |
1.2m |
7.92m² |
11 |
0.0425 W/mk |
1.176 M²K/W |
75mm |
600mm |
1.2m |
5.76m² |
8 |
0.0425 W/mk |
1.764 M²K/W |
100mm |
600mm |
1.2m |
4.32m² |
6 |
0.0425 W/mk |
2.352 M²K/W |
|
Thickness |
Width |
Length |
Area |
Slabs
Per Pack |
Thermal
Conductivity |
Thermal Resistance |
90mm |
550mm |
1.17m |
9.01m² |
14 |
0.0425 W/mk |
2.117 M²K/W |
90mm |
550mm |
1.17m |
9.01m² |
14 |
0.039 W/mk |
2.307 M²K/W |
140mm |
550mm |
1.17m |
6.44m² |
10 |
0.0425 W/mk |
3.294 M²K/W |
140mm |
550mm |
1.17m |
5.15m² |
8 |
0.039 W/mk |
3.589 M²K/W |
The table below shows the U-values achieved using
Non-Itch Timber Frame Insulation slabs placed between
the studs.
Non-Itch Timber Frame Insulation Slabs including YBS Breather-Foil
FR
Thickness |
Stud Thickness |
Thermal Conductivity |
U-value W/M²K |
90mm |
89mm |
0.039 W/mk |
0.33 |
90mm |
89mm |
0.0425 W/mk |
0.34 |
140mm |
140mm |
0.039 W/mk |
0.25 |
140mm |
140mm |
0.0425 W/mk |
0.26 |
Non-Itch Timber Frame Insulation Slabs including standard
breather membrane
Thickness |
Stud Thickness |
Thermal Conductivity |
U-value W/M²K |
140mm |
140mm |
0.039 W/mk |
0.28 |
140mm |
140mm |
0.0425 W/mk |
0.31 |
|
|
The table below shows the U-values achieved using Non-Itch Cavity Insulation slab 39 placed within the cavity of external masonry walls. |
Thickness |
Width |
Length |
Area |
Slabs
Per Pack |
Thermal
Conductivity |
Thermal Resistance |
65mm |
450mm |
1.2m |
9.72m² |
18 |
0.039 W/mk |
1.666 M²K/W |
75mm |
450mm |
1.2m |
8.64m² |
16 |
0.039 W/mk |
1.923 M²K/W |
85mm |
450mm |
1.2m |
7.56m² |
14 |
0.039 W/mk |
2.179 M²K/W |
100mm |
450mm |
1.2m |
6.48m² |
12 |
0.039 W/mk |
2.564 M²K/W |
The table below shows the U-values achieved using
Non-Itch Cavity Insulation slab 39 placed within the
cavity of external masonry walls.
U-Value Determined by Block Type (W/m2K)
Thickness |
Dense Block ( 1.100) |
Medium Block ( 0.340) |
Aerated Block ( 0.110) |
65mm |
0.44 |
0.41 |
0.33 |
75mm |
0.4 |
0.37 |
0.3 |
85mm |
0.36 |
0.34 |
0.28 |
100mm |
0.32 |
0.3 |
0.25 |
|
Application
Installation of slabs should start below the DPC (preferably by at least 150mm) to minimise cold bridging. The first row of ties should be at 450mm centres horizontally. The width of cut batts should always be 5mm greater than the width to be insulated, eg wall tie centres.
Build up a complete section of the leading leaf to one course above the next row of wall ties spaced at max. 900 mm horizontally. Ensure that all mortar joints are properly filled, particularly the perpends.
It is essential that all joints between Non-Itch slabs are clean and tightly butted. Fit Non-Itch cavity slabs by compressing between the two rows of wall ties to form a clean and tight butt jointed course. To prevent water penetration to the inner leaf during driving rain, it is essential that no gaps are left between the slabs.
Fit the slabs closely around wall openings. Slit the slabs neatly where additional wall ties occur.
At corner joints, edges must be closely butted. Cut the slabs accurately to fit between wall ties, if not conventionally coursed.
Handling and Storage
Non-Itch Cavity Insulation slab 39 is easy to handle with no protective clothing and easy to install, being lightweight and easily cut to size. It is supplied in polythene packaging, designed for short term protection only.
Protect the top of the cavity wall insulation at the end of the work period with a waterproof covering. Store or cover Non-Itch cavity slabs not in use and protect from site damage.
Product Testing
Test Report No: 0207-L-07
EN 12087: Thermal insulating products for building applications - Determination of long term water absorption by immersion, method 1A (1997-07).
Test Report No: 0207-L-07
EN1604: Thermal insulating products for building applications - Determination of dimensional stability under specified temperature and humidity conditions (1997-01).
Test Report No: 0207-L-07
EN 12667: Thermal performance of building materials and products - Determination of thermal resistance by means of guarded hot plate and heat flow meter method - Products of high and medium thermal resistance (2001-02).
Test Report No: 0207-L-07
EN822: Thermal insulating products for building applications - Determination of length and width (1994-11).
Test Report No: 0207-L-07
EN823: Thermal insulating products for building applications - Determination of thickness(1995-05).
Test Report No: 0207-L-07
BS 5803-4: Thermal insulation for use in pitched roof spaces in dwellings - Part 4: Methods for determining flammability and resistance to smoldering (1985).
YBS Insulation Limited
The Crags Industrial, Park Morven Street, Creswell, Derbyshire, S80 4AJ.
Technical Support 0905 06 600 62 ...
Calls are charged at 60p per minute from a UK BT landline. Other networks may vary.
Email: enquiries@ybsinsulation.com
Page last updated
June 1, 2010
Tuesday, June 1, 2010
|